How to scope a country-scale satellite sweep before you commit budget

Most market-intelligence teams that ask about a country-scale sweep have the same gap in their brief: they know the facility type they're after, roughly, but they haven't written down the version of it that a vendor can search against. That gap is where budget gets wasted, and it costs the most once a vendor has already started processing imagery against a vague brief.
Define the target signature before you pick a vendor
A "facility signature" is the set of visual traits that separate what you're counting from everything else in a 0.5–2 m RGB frame. Roof shape and footprint, stack arrangement, yard layout, the presence of storage tanks or stockpiles, access roads of a certain width. If your internal description is "mid-size fabrication plants," that's a category, not a signature. A vendor running the sweep needs the version that holds up against a satellite image, built from what's actually visible from above rather than from a spec sheet or a permit filing.
This is the part worth doing in-house first, even roughly. Pull ten to twenty known sites of the type you're after, from whatever partial list you already have, and look at what they share in overhead imagery. Note what varies (paint color, site age, vegetation) and what doesn't (the footprint ratio, the stack count, the yard-to-building proportion). That's your working signature. Hand it to the vendor as a starting point. The first round of results will refine it further.
Decide the boundary and the cadence before you ask for a price
Two decisions shape the cost more than anything else in the brief, and both are yours to make, not the vendor's.
First, the boundary. "Country-scale" sounds like a fixed unit but it isn't. A sweep of a country's industrial corridors is a different job than a sweep of every square kilometer within its borders, and the difference shows up directly in processing cost and timeline. If your addressable market sits along rail lines, ports, or a known industrial belt, say so. Scoping a satellite site search against the whole landmass when your buyers only operate in three provinces is money spent finding nothing.
Second, the cadence. A one-off pull answers "how many sites exist today." An annual sweep answers "how many sites exist, and which ones are new, idle, or gone since last year." Planning an annual facility sweep instead of a single pass changes what you're buying: a standing census you can run sales territory and capacity planning against year over year. If your sales team needs to know when a competitor builds a new yard, cadence is the whole point of the exercise, and it should be decided before you price anything, because annual commitments and one-off jobs aren't priced or scoped the same way.
What a "hit" needs to mean before you sign anything
Before you commit budget, get specific about what counts as a confirmed site versus a candidate worth a second look. A sweep at 0.5–2 m resolution with RGB imagery and no thermal data will surface facilities matching your visual signature well. It won't tell you what's running inside the buildings, confirm ownership, or distinguish an active site from a mothballed one with intact roofing. Know that going in, so the deliverable you're scoping matches what the imagery can show, and so your planning team isn't expecting attribute data the sweep was never built to produce.
Write all three decisions down, the signature, the boundary and cadence, and the hit definition, before the first scoping call with any vendor. It turns "can you do a country-scale sweep" into a brief a vendor can quote against, and it's the difference between a proposal that matches what you need and one that's padded to cover ambiguity you left in the request.
Facility Discovery runs this kind of sweep as an annual, country-scale pass built around a target signature you define, and the site is a good place to work out whether your brief is ready before you send it to anyone.